|
![]() |
#11 |
Raw Dog
![]() |
![]()
Busy weekend here.
I got a lot of work done. Crawling into the oven to clean and point the joints took way longer than I expected Thursday, so I wasn't able to actually build until Friday evening after work. Friday night I put up the vent arch ![]() Saturday I put up the flue gallery and covered the dome with the remaining mortar mix. ![]() And made sure the door fit ![]() Sunday I added two inches of ceramic fiber blanket for insulation, lashed it all down with chicken wire, and put on a waterproofing flashing I also installed a thermowell through the brickwork so I can monitor oven temps when the door isn't in. ![]() Thermowell is more visible here ![]() All that's left to finish the oven is to put on a perlite shell over the blanket. However, I need to get the granite for the stand cut before I can do this, so I can bring the shell over the granite and eliminate the seam. Hopefully he doesn't take too long.
__________________
Sex junkie looking for a dealer |
![]() |
![]() |
Thread Tools | |
Display Modes | |
|
|