Well, kitchen remodel got pushed back to the 23rd. The inspector wants to come out and double check that the wall that’s coming down is in fact a non load bearing wall. I hope all goes well the whole remodel is dependent on that wall coming down. Our contractor has done 3 houses in the neighborhood (cookie cutter neighborhood) and he’s positive that the wall is non load bearing as well as two other contractors that we looked into. So fingers crossed.
As a plus side is that all our appliances are no eta, this gives us a bit more time for everything to fall into place.

One thing I do regret is I have a few, I think two, lower cabinets, I didn’t think about that lower cabinets suck, I should have had drawers or pull out shelving done.
__________________
Be Excellent to Each Other - Bill & Ted
bonjing is offline   Reply With Quote